Power Plant
Projects
REFERENCE PROJECT |
Customer:
Andritz Oy
Project:
Steam Turbine Plant for Riikinvoima Oy WTE Project, jointly with TGM Kanis Turbinen GmbH
Order:
2014
Take-Over:
2016
|
|
Energico's
Services:
- Plant and piping engineering
- PI-diagrams (DH-system, Air Evacuation)
- Site co-coordination and supervision
- Commissioning
Energico's Scope of Supplies:
- District Heat Exchangers
- Condensate pumps
- Air Evacuation system
- Piping and valves
- Thermal insulation
- Field instruments
|
|
Main Data of the
Steam Turbine Plant: |
|
|
- live steam flow rate |
18 kg/s |
- live steam pressure |
83 bar(a) |
- live steam temperature |
497 °C |
- DH water flow rate |
233 kg/s |
- electrical output |
16 MW |
- district heat output |
33 MW |
« Back |