Power Plant
Projects
| REFERENCE PROJECT |
|
Customer:
IVO International Ltd, Oulu Energy, Finland
Project:
Turnkey Delivery of 140 MW Steam Turbine Plant Toppila 2,
Oulu jointly with LMZ, Russia
Order:
1991
Take-Over:
1995
|
 |
| |
Energico's Services:
- commercial
and technical leadership functions of the consortium
- lay-out
and piping engineering
- PI-diagrams and process design of BOP
-
basic engineering of C&I-system
-
site management and supervision
Energico's Scope
of Supplies:
- LP- and HP-heaters with bypass system
- condensate
pumps
- piping and insulation
- feed water tank/deaerator
- shut-off and control valves
- mechanical measurements
- bypass systems
for LP-turbine
- condenser titan tube bundles and tube cleaning system
-
installation of turbine and auxiliary equipment |
| |
| Main Data for 140
MW Unit |
| Fuel: |
Pulverised Peat (Heavy Oil) |
|
Parameters:
|
|
| - live steam flow rate |
103/108 kg/s |
| - live steam pressure |
152 bar |
| - live steam temperature |
540 °C |
| - reheat steam pressure |
20 bar(a) |
| - reheat steam temperature |
540 °C |
| - feed water temperature |
260 °C |
| - cooling water flow rate |
4000 kg/s |
| - electrical output |
113/140 MW |
| - district heat output |
172 MW |
« Back |