Customer:
Länsirannikon Voima Oy
Project:
Flue Gas Desulphurization (FGD) Plant Turnkey delivery by
FLS Miljø a/s Denmark
Order:
FGD Plant 1991
Take-Over:
FGD Plant 1993
|
 |
| |
Energico's Services:
-
agency activities- coordination of local supplies and services
- detailed design of electrical systems
- basic engineering of C&I-systems
-
engineering fo HVAC-systems
Energico's Scope of Supplies:
Supply, installation, commissioning and trial run
of the following systems:
- C&I-systems
- electrical equipment
-
HVAC-systems |
| |
|
| Main Data for
FGD System of 240 MWe |
| Power Plant |
|
| |
|
| Fuel: |
Pulverised Coal (Heavy Oil) |
| Process: |
Mitsubishi single loop limestone gypsum recovery
FGD-system |
| |
|
| Parameters for
FGD-system: |
| - type of process |
wet co-current process |
| - coal sulphur content |
max 2 % |
| - flue gas flow rate |
770.000 Nm3/h |
| - FGD inlet SO2 |
1500...3500(wet) mg/Nm3 |
| - FGD outlet SO2 |
70 mg/MJ (=190 mg/Nm3) |
| - SO2 removal
efficiency |
96,5 % |
| - by-product |
walkboard quality gypsum |